Assume that Phil wants to minimize his inventory requirements. Assume that each order will be only for what is required for a single period. Using the forms in the case, calculate the net requirements and planned order releases for the gearboxes and input shafts. Assume that the lot sizing is done using a lot for lot.
Calculate a schedule using lease-total-cost lot sizing. What are the savings with this new schedule?
Hi there! Get instant help with.Without paying anything upfront.
Disclaimer: The services provided are meant to assist the buyer by providing a guideline and the product provided is intended to be used for research or study purposes.